Replacement of Existing Outdoor Aindar Sub-30 with New GIS Substation

Installation of GIS, power transformer, protection, control and SAS panels including cable laying and termination.

Saudi Arabia Duration: 6 Months (June 2025) Year: 2025 Category: Electrical Projects
Project Overview

Replacement of Existing Outdoor Aindar Sub-30 with New GIS Substation

Installation of GIS, power transformer, protection, control and SAS panels including cable laying and termination.

Project Description

Installation of GIS, power transformer, protection, control and SAS panels including cable laying and termination.

Project at a Glance

Client Saudi Electricity Company
Contractor Abahsain Consolidated Co.
Location
Saudi Arabia
Status
Completed
Duration
6 Months (June 2025)
Year
2025
Category
Electrical Projects
Safety First Strict adherence to HSE standards with zero compromise.
Quality Assured Delivered to the highest engineering and quality standards.
Delivered on Time Completed within the planned schedule.
Expert Team Experienced professionals ensuring reliable project delivery.
Key Deliverables

Key Deliverables

Location Saudi Arabia
Status Completed
Duration 6 Months (June 2025)
Contractor Abahsain Consolidated Co.

The Challenge

The project required safe execution, technical coordination and dependable site productivity.

Our Scope

Installation of GIS, power transformer, protection, control and SAS panels including cable laying and termination.

Our Solution

SESCCO supported the works through skilled teams, organized execution and quality-focused delivery.

Key Outcomes

The project contributed to client objectives while reflecting SESCCO’s commitment to quality and safety.

Detailed Scope
01

Scope review

Review project requirements, location, drawings and execution constraints before mobilization.

02

Site execution

Coordinate manpower, materials and quality checks during the work phase.

03

Handover support

Support completion records, close-out information and follow-up coordination where required.

Project Metrics
Saudi ArabiaLocation
CompletedStatus
6 Months (June 2025)Duration
Abahsain Consolidated Co.Contractor

Project Documents

Download project-related files, case studies or capability references.

Need a similar project partner?

Contact SESCCO to discuss your engineering or contracting requirements.

Start a Project

Let’s Build Something Great Together

Reach out to us for project inquiries, collaborations or support. We’ll get back to you promptly.

Contact Our Team